KC KELBY CONTRERAS The Florida Real Estate Specialist

New construction · Edgewater

Aria Reserve

Melo Group's twin 62-story towers linked by a skybridge, now delivered.

Project Snapshot

Completed

700 NE 24th Street and 725 NE 24th Street, Miami, FL 33137

Twin waterfront condominium towers

782 residences

Two 62-story towers

from ~$1.9M (developer)

South Tower delivered 2025; North Tower completed Q4 2026

Melo Group

Every claim on this page links to a dated public source, verified October 2026.

This site has no live MLS feed. To confirm availability at Aria Reserve with Kelby, use the current listings page at /listings/, the booking calendar, or a direct call.

All of Edgewater

The project in brief

Aria Reserve at a glance.

Aria Reserve is a pair of 62-story twin waterfront towers at 700 and 725 NE 24th Street in Miami's Edgewater, developed by Melo Group with Arquitectonica as architect. The towers hold 782 residences (383 in the South Tower, 399 in the North Tower) in one- to four-bedroom layouts of roughly 700 to 4,200 square feet, with developer pricing from about $1.9 million. The South Tower delivered in 2025 and the North Tower completed in Q4 2026.

Condominium Waterfront Luxury

Status vocabulary: Unverified, Under Construction, Completed, Pre-Construction, Sold Out, Sales Released. Prices are reported by the linked sources on the dates shown and change often; nothing here is a guarantee of price, value, or completion date.

Identity

Melo Group's twin towers joined by a glass skybridge

Aria Reserve is developed by Melo Group with Arquitectonica on the architecture, MORADA on interiors, and ArquitectonicaGEO on the landscape. The twin 62-story waterfront towers at 700 and 725 NE 24th Street in Edgewater are joined by a shared glass skybridge, holding 782 residences: 383 in the South Tower and 399 in the North Tower.

Pricing & availability

Developer pricing from about $1.9 million; resale spans a wide range

Developer and listing pricing, 2025 through 2026

Developer pricing started around $1.9 million, and resale listings have ranged from about $440,000 to $538,000 at the low end per some sources, with the reference range of the program running up from about $1.1 million depending on the source. These are dated asking figures, not guarantees. Current availability is confirmed directly with Kelby.

Architecture & design

One to four bedrooms, roughly 700 to 4,200 square feet

The 782 residences are one- to four-bedroom layouts with two to five and a half baths, running roughly 700 to 4,200 square feet. The towers sit on two-plus acres of waterfront along Biscayne Bay, with a 547-foot baywalk and a custom watersports dock.

Amenities

Two-plus acres of waterfront amenities across the baywalk

  • Semi-Olympic lap pool and lounge pool with children's splash pad and hot tub
  • Water sports marina with paddleboard and kayak launch
  • Tennis, basketball, and paddleball courts
  • Sky lobby lounge and business center
  • Wine cellar, fitness center, and yoga lounge
  • Wellness spa with sauna and steam room
  • 547-foot baywalk and custom watersports dock
  • Valet parking and the Flatiron Room waterfront dining

Construction & timeline

South Tower delivered 2025, North Tower completed Q4 2026

Completed · South Tower delivered 2025; North Tower completed Q4 2026

The South Tower delivered in 2025, with estimated delivery in Q4 2025, and the North Tower received its temporary certificate of occupancy in October 2026, completing the project. Today both towers are delivered and sell their remaining developer inventory and resale homes.

Location & access

Edgewater's Biscayne Bay waterfront

700 and 725 NE 24th Street sit on the bayfront in Edgewater, the dense residential district between Downtown Miami and the Design District. Wynwood, the Design District, and Downtown Miami are all short drives, and Miami International Airport is roughly 25 minutes by car.

Ownership & rules

Condominium ownership with terms to confirm

Aria Reserve is a condominium development with an association governing both towers. The current condo fee schedule, rental rules, and pet policy read Contact for current information and are confirmed with the building's management or with Kelby.

Buying through Kelby

Representation in a delivered pair of towers

Kelby represents buyers at Aria Reserve on both remaining developer inventory and resale from the first tour through closing, with buyer-agent commission typically settled at closing. Because this site has no live MLS feed, current availability is always confirmed directly with Kelby.

Project FAQs

Straight answers about Aria Reserve.

Is Aria Reserve still selling?

Both towers are delivered: the South Tower in 2025 and the North Tower in Q4 2026, so it sells remaining developer inventory and resale homes. Current availability is confirmed directly with Kelby.

Where is Aria Reserve?

At 700 and 725 NE 24th Street on the Biscayne Bay waterfront in Miami's Edgewater district.

How many residences are there?

782 across the twin towers: 383 in the South Tower and 399 in the North Tower.

What floor plans are available?

One- to four-bedroom residences of roughly 700 to 4,200 square feet.

What are the price ranges?

Developer pricing started around $1.9 million, with resale listings spanning a wide range. Confirm the current market with Kelby.

Can Kelby represent me at Aria Reserve?

Yes. Kelby represents buyers on inventory and resale, with buyer-agent commission typically settled at closing. Current availability is always confirmed directly with Kelby.

Provenance

Information reviewed October 2026.

Every claim on this page is drawn from public research and linked to its dated source below. Figures such as asking prices, HOA fees, and completion dates change; where a field could not be verified it reads “Contact for current information” or “Not verified”, and the answer is one call away. Nothing on this page is a guarantee of price, availability, or completion date.

  • RESIDENT, Aria Reserve fully completed

    October 2026: North Tower completion

    Source
  • Florida YIMBY, North Tower milestone

    March 2025: construction progress

    Source
  • Amazing Architecture, Aria Reserve towers

    October 2026: towers, units, amenities

    Source
  • Miami Living Magazine, Aria Reserve

    October 2026: project profile and pricing

    Source

Each source above verified October 2026

Request pricing · Aria Reserve

Get the current Aria Reserve read from Kelby.

Current price list, floor plan availability, deposit structure, and the honest verdict on whether this project fits your plan. Send your criteria and Kelby replies personally, usually within one business day. Real-time availability is always confirmed directly with Kelby.

Request pricing & availability

Include the unit type, budget, and timeline you are considering at Aria Reserve.

A personal reply from Kelby with current pricing and availability, not a form letter.

Compare Edgewater projects

Two projects on your list? Compare them on one call.

Prices, delivery timing, fees, and resale: Kelby works these developments weekly and will walk the trade-offs through in fifteen minutes.

Call Kelby